Loading
  • English
    • English
    • Serbian
    • Bosnian
Pozovite nas: 00381 (0)31 310 0263
Cross-border Programme
  • Facebook
  • Twitter
  • Mail
  • Programme
    • About programme
    • Programme documents
    • Programme area
    • Priorities and measures
    • Relevant terms
    • Programme implementing structures
      • Joint Technical Secretariat (JTS)
      • Joint Monitoring Committee
      • The Intermediate Body for financial management
      • Operating Structures
  • Calls for Proposals
    • IPA II
      • First Call for Proposals-IPA II
        • Guide for applicants First call-IPA II
        • FAQ
        • Award list
      • Second Call for Proposals-IPA II
        • Application package with the Guidelines for Applicants
        • FAQ
        • Work Plan
        • Award list
      • Third Call for Proposals-IPA II
        • Application package with the Guidelines for Applicants
        • Work Plan 3
    • IPA III
      • First Call for Proposal
        • Application package with Guide for applicants First call
        • FAQ
        • Award list
  • Partner Search
  • Project Implementation
    • Implementation Guide-IPA II
    • VAT Exemption Procedure
    • Queries and answers
  • Project database
  • Newsroom
    • News
    • Events
    • Photo Gallery
  • Documents
    • Publications
    • Legal Framework
  • Contact
  • Search
  • Menu

1st Call for Proposals within the IPA Cross-border Cooperation Programme Serbia – Bosnia and Herzegovina 2021-2027 has been launched

Topicality
8. May 2025./by Irena Markovic

Old Railways of Western Serbia in a New Light: Permanent Multimedia Exhibition Opened in Požega

30. April 2025./by Irena Markovic

Birds Connecting People: New Routes, New Brands, and New Opportunities for Local Communities!

25. April 2025./by Irena Markovic

A New Tourist Offer Unveils the Charms of Birdwatching in the Cross-Border Area of Serbia and Bosnia and Herzegovina

Guidelines for applicants (GfA)- Third Call for Proposals IPA II

Guidelines for Applicants include all important and mandatory instructions to follow when accessing EU funding. Annexed to the Guidelines are those templates to be mandatory used to apply to the Call for Proposal.

Project Implementation Manual (PIM)-Third Call for Proposals IPA II

Document providing detailed guidance for Project Partners of the approved projects in the implementation phase, from contracting to project closure including reporting obligations, payment of IPA Funds and other programme-related requirements.

Operational Programme IPA III (OP)

Operational Programmes are detailed plans in which the Candidates and Potential Candidates for the the EU membership set out how money from the Instrument for Pre-Accession Assistance (IPA) will be spent during the programming period. They can be drawn up for a specific region or a thematic goal on national or regional level (e.g. Environment).

Latest News

Project evaluation in progress

News and events, Uspostavljanje sistema primarne selekcije otpada u školama u Užicu i Tuzli
Evaluation of results and achievements of our project, which is implemented by Insitute for Territorial Economic Development from Belgrade (InTER), started with a two-day visit to Užice at the end of last week. The evaluation aims at reviewing…
9. April 2014.
https://srb-bih.org/wp-content/uploads/2024/02/cbsrbbih.jpg 0 0 Jelena Stojanov https://srb-bih.org/wp-content/uploads/2024/02/cbsrbbih.jpg Jelena Stojanov2014-04-09 10:56:262014-05-09 11:35:05Project evaluation in progress

Visit to the International Trade Fair in Mostar

Jačanje profesionalne edukacije odrsalih u ruralnim sredinama, News and events
I hurried 210-260 Dumps into the local department store to grab1 some last minute Chirsmas gifts. 210-260 Dumps 210-065 dumps I 300-208 dumps looked at all the 300-208 dumps people and grumbled2 to myself. I would be 1K0-001 dumps in here…
8. April 2014.
https://srb-bih.org/wp-content/uploads/2024/02/cbsrbbih.jpg 0 0 Jelena Stojanov https://srb-bih.org/wp-content/uploads/2024/02/cbsrbbih.jpg Jelena Stojanov2014-04-08 11:50:312019-08-02 11:06:53Visit to the International Trade Fair in Mostar

New Project Beneficiaries in Užice!

News and events, Uspostavljanje sistema primarne selekcije otpada u školama u Užicu i Tuzli
Because of the undoubted actuality of this theme and ubiquitous need for an adequate attitude towards municipal waste , the results of the introduction of the primary waste selection in schools are more visible and positive reactions are numerous.…
3. April 2014.
https://srb-bih.org/wp-content/uploads/2024/02/cbsrbbih.jpg 0 0 Jelena Stojanov https://srb-bih.org/wp-content/uploads/2024/02/cbsrbbih.jpg Jelena Stojanov2014-04-03 10:30:142017-09-27 18:02:39New Project Beneficiaries in Užice!
Page 106 of 201«‹104105106107108›»
All News

Cross Border Programme

75

Total funded projects

23,363,161.53 €

The contracted funds for implementation of the projects

489

Total number of applications

Partners

Ministry of European Integration of The Republic of Serbia

Directorate for European Integration of Bosnia and Herzegovina

© Copyright - Cross Border

This website is funded by the European Union. The content of this webiste is sole responsibility of technical assistance for implementation of the Cross-Border Programme Serbia-Bosnia and Herzegovina and can in no way be taken to reflect the views of the European Union
  • Facebook
  • Twitter
  • Mail
Scroll to top